Recovery.Gov Project Tracker
Can't imagine the incoming Tea Partiers will be impressed if they get the EMC2/Naval run-around when they start asking after the line item on a speculative fusion research project financed by bail-out funds.
The Recovery Act money has spawned more than its share of boondoggles, would hate to see PW end up on the black list
http://www.heartland.org/full/28161/Sum ... Blues.html
• $700,000 to study why monkeys respond negatively to inequity
• $193,956 to study voter perceptions of the economic stimulus
• $363,760 to help NIH promote the positive impacts of stimulus projects
• $456,663 to study the circulation of Neptune’s atmosphere
http://www.scribd.com/doc/35327297/Summ ... -the-Blues
The Recovery Act money has spawned more than its share of boondoggles, would hate to see PW end up on the black list
http://www.heartland.org/full/28161/Sum ... Blues.html
• $700,000 to study why monkeys respond negatively to inequity
• $193,956 to study voter perceptions of the economic stimulus
• $363,760 to help NIH promote the positive impacts of stimulus projects
• $456,663 to study the circulation of Neptune’s atmosphere
http://www.scribd.com/doc/35327297/Summ ... -the-Blues
Heh.progress made on Theoretical modeling of the Polywell.
I wonder what their simulations look like now. Cusp-plugging? Losses scaling at B^.25? I'd sure like to know what the WB-8 neutron counts look like.
n*kBolt*Te = B**2/(2*mu0) and B^.25 loss scaling? Or not so much? Hopefully we'll know soon...
icarus,
Yes, that may a reason why it's being kept quiet. It's easy to imagine reading things like "Top DOE fusion scientists interviewed today said the concept had little chance of success."
I'm starting to like high oil prices...
Yes, that may a reason why it's being kept quiet. It's easy to imagine reading things like "Top DOE fusion scientists interviewed today said the concept had little chance of success."
I'm starting to like high oil prices...
n*kBolt*Te = B**2/(2*mu0) and B^.25 loss scaling? Or not so much? Hopefully we'll know soon...
The part about theoretical modeling implies they have new data.TallDave wrote:Heh.progress made on Theoretical modeling of the Polywell.
I wonder what their simulations look like now. Cusp-plugging? Losses scaling at B^.25? I'd sure like to know what the WB-8 neutron counts look like.
My guess is they did start getting plasmas in April. Nebel's reputation with me stays very good. Also, it says his salary is $160,000. I think it's safe to say he's earning all of it and hopefully more in his future.
General Atomics does a lot of high-power electrical stuff. Maybe EMC2 is positioning itself for WB9? If they get the ~$200M bandied about for a 100MW reactor, I submit there may be doubts as to whether EMC2 would be in a real good position to handle that amount. GA gets contracts like that with regularity. Just a thought.DeltaV wrote:That location is not far from General Atomics, SAIC, SPAWAR Systems Center Pacific and UCSD. I wonder if they've arranged one or more research partnerships?
For that matter, NASSCO is located in San Diego, too. If they are looking all the way down the road to installing a BFR in a ship, then San Diego is as good a place to locate as any, and the only option on the west coast.
http://wikimapia.org/5569450/National-S ... ing-NASSCO
(Is this topic drift?)
http://wikimapia.org/5569450/National-S ... ing-NASSCO
(Is this topic drift?)
Aero
I don't know. I had similar thoughts about why EMC2 might be relocating to San Diego, so I would vote "no".Aero wrote:(Is this topic drift?)
By the way, does the phrase "fully under construction" strike anyone else as odd? I can understand "under construction" and "fully constructed", but what's "fully under construction" supposed to mean?

They said they did not.D Tibbets wrote:I assume you are countering the hearsay evidence originally presented. If you are countering this with authority, please provide your source.ladajo wrote:Yes, but neither John Pazik nor Lynn Peterson commented on Polywell at the conference.
Dan Tibbets
Regarding the relocation to San Diego, it is probably related to navy infrastructure and ease of access, but also, recall that a significant amounnt of work was done there previously.
It occurs to me that some of the equipment that EMC2 transferred to Space Development Corp(?) in 2005 might still be available. In particular that large vacuum chamber. It might not be compatible with the WB8 assembly, but it may be useful for component testing, and other related projects that are too big for their 1 meter chamber.
Dan Tibbets
Dan Tibbets
To error is human... and I'm very human.
Sounds reasonable, along with NASSCO for ship mods and Space Dev for the equipment/technicians Dr. Bussard gave them. SSCPac (formerly NOSC, Naval Ocean Systems Center) has a history with LENR, and might be brought to bear for radiation detection/shielding (it just wouldn't do to have a BFR powered ship broadcast its location via neutrons, gammas, x-rays,...). SAIC is into all sorts of leading edge DoD stuff. UCSD is the home of the San Diego Supercomputer Center.KitemanSA wrote:General Atomics does a lot of high-power electrical stuff. Maybe EMC2 is positioning itself for WB9? If they get the ~$200M bandied about for a 100MW reactor, I submit there may be doubts as to whether EMC2 would be in a real good position to handle that amount. GA gets contracts like that with regularity. Just a thought.DeltaV wrote:That location is not far from General Atomics, SAIC, SPAWAR Systems Center Pacific and UCSD. I wonder if they've arranged one or more research partnerships?
I always assumed they got all that stuff back for the WB-7 contract.D Tibbets wrote:It occurs to me that some of the equipment that EMC2 transferred to Space Development Corp(?) in 2005 might still be available. In particular that large vacuum chamber. It might not be compatible with the WB8 assembly, but it may be useful for component testing, and other related projects that are too big for their 1 meter chamber.
Dan Tibbets
n*kBolt*Te = B**2/(2*mu0) and B^.25 loss scaling? Or not so much? Hopefully we'll know soon...
Seems like, but also the navy may have held some in storage for them. The inventory sheets we saw did not seem to include some of the larger hardware.
On a separate note, any guesses on how long it will take Rick to update the the EMC2 page to show they moved to San Diego?
My other question is if anyone credible is in San Diego and can go knock the new door? Unfortunately, I do not see myself getting out there until well after April. I will be hitting PA/DC, and then NY, and GA and FL before June. No chance to get to the other side in that.
On a separate note, any guesses on how long it will take Rick to update the the EMC2 page to show they moved to San Diego?
My other question is if anyone credible is in San Diego and can go knock the new door? Unfortunately, I do not see myself getting out there until well after April. I will be hitting PA/DC, and then NY, and GA and FL before June. No chance to get to the other side in that.